Water St, Caringbah
Date:
October, 2019
Project type:
Structural rectification of collapsing balconies
About Project
CBS was engaged by the property owners to rectify defective workmanship that had resulted in significant structural defects and widespread water entry issues.
CBS used their own scaffold equipment to permit external access to the high level balconies and minimise the internal access required, so that the property could remain occupied for the duration of the works.
Summary
Careful consideration and quality trade staff were essential to match original architectural finishes.